Canadian Electrical Estimating

Canadian Electrical Estimating Services for Contractors and GCs

MeTiger helps Canadian contractors turn tender drawings, specifications, and addenda into clean electrical takeoffs, material lists, labour summaries, marked-up drawings, and scope notes. Our work is built for review: clear quantities, clear assumptions, and clear exclusions before bid day.

Canada-focused estimatingCEC-aware scope reviewMarked-up plansLabour & material summariesNDA on request
Who we help

Built for the people who own the electrical bid

We work behind the scenes for the teams responsible for pricing and delivering electrical scope in Canada.

Electrical contractors General contractors Developers Project managers Estimators Construction managers Design-build teams Facility teams
The problem

Why electrical bids get missed

Electrical scope hides in the gaps between documents. The most common places margin leaks out before the bid even goes in:

  • Missed items between drawings, specifications, and schedules
  • Equipment power requirements buried in the mechanical and other trades’ documents
  • Addenda that change scope late and never make it into the count
  • Incomplete or conflicting drawings with no documented assumptions
  • Weak takeoffs that can’t be checked line by line
  • Tight deadlines that force a rushed, incomplete count
Deliverables

What your estimate includes

  • Quantity takeoff workbook
  • Colour-coded marked-up drawings
  • Material list by system
  • Labour-hour summary
  • Labour-unit basis and assumptions
  • Inclusions and exclusions
  • Drawing and specification assumptions
  • RFI and scope-gap log
  • Addenda review
  • Bid summary
  • Alternates and value-engineering notes where applicable
  • Gear and long-lead item notes where applicable
  • Optional final review call
Coverage

Electrical systems we quantify

Service & distribution

  • Service entrance and distribution
  • Switchgear, switchboards, panels
  • Transformers
  • Metering

Power & feeders

  • Feeders and branch power
  • Raceways and conductors
  • Cable tray and supports
  • Mechanical equipment power

Motors & controls

  • Pumps, motors, VFDs
  • Starters and MCCs
  • Generators, ATS, UPS
  • Battery systems

Lighting

  • Interior lighting and controls
  • Emergency lighting and life safety
  • Site lighting
  • Underground electrical

Grounding & safety

  • Grounding and bonding
  • Fire alarm coordination
  • Life-safety coordination

Low voltage & special systems

  • Low-voltage rough-in
  • Data / communications rough-in
  • Access control / security rough-in where included
  • EV charger rough-in where included
  • Utility coordination notes
Project types

Canadian project types we estimate

Commercial & retail

Commercial tenant improvements, retail fit-outs, offices, and mixed-use projects.

Hospitality

Restaurants and hospitality build-outs with kitchen power and interlock coordination.

Industrial

Warehouses and light industrial through heavier plant and process electrical.

Multi-family residential

Multi-family and residential developments, suites, and common-area power and lighting.

Municipal & utility

Municipal facilities, pump stations, and utility infrastructure with controls and site electrical.

Institutional & upgrades

Schools and institutional projects where appropriate, plus service upgrades and distribution work.

Approach

CEC-aware estimating approach

Canadian electrical estimating support informed by CSA C22.1 / the Canadian Electrical Code requirements, provincial practices, project specifications, local utility requirements, and bid documents. We estimate what the documents call for and flag where they don’t agree.

Final compliance remains subject to the project engineer, the local authority having jurisdiction, and applicable provincial/territorial requirements. MeTiger provides estimating and design coordination support — not a replacement for stamped engineering or authority-having-jurisdiction review — and works alongside the engineer of record where required.
Scope-gap review

We flag what’s missing before you price it

Every package includes a scope-gap and RFI log: items that appear in one document but not another, equipment with no clear power source, details that conflict, and assumptions we had to make to complete the count. You see the gaps instead of inheriting them after award.

  • Cross-checks between drawings, specifications, schedules, and addenda
  • Other-trade equipment connections reconciled against the electrical scope
  • Documented assumptions and exclusions, not silent guesses
  • An RFI list you can send straight to the design team
Process

How it works

1

Upload drawings or send a plan link

Send your PDF or DWG set, specifications, and addenda — or a Dropbox / Drive / Procore link.

2

Confirm scope and deadline

We confirm project location, project type, scope, and bid due date.

3

Receive a fixed quote

A fee and delivery window, quoted after drawing review, before work begins.

4

Takeoff and scope review

We perform the takeoff and organize the electrical scope by system.

5

Document assumptions and gaps

Assumptions, exclusions, and scope gaps are logged clearly.

6

Deliver the package

You receive the reviewable estimate package on the agreed window.

7

Optional review call

A short walkthrough before bid submission, if you want one.

Pricing

Pricing and quote process

Every project is quoted based on drawing size, scope complexity, project type, deadline, and requested deliverables. Send the bid set and due date; MeTiger will confirm scope, fee, and delivery window before work begins. No cheap-race pricing — a clear fee for a package you can actually bid with.

Why MeTiger

Careful, technical, and built for review

Reviewable by design

Clear quantities, documented assumptions, and explicit exclusions — so your team can check the number, not just trust it.

Canada-focused

Estimating informed by CSA C22.1 / the Canadian Electrical Code, provincial practices, and local utility requirements.

Scope-gap discipline

We surface missing and conflicting information before bid day, where it’s cheap to fix.

Remote across Canada

Delivered remotely on an agreed window, with an NDA available on request.

Senior estimating

Organized trade packages and labour-unit reasoning you can defend to a client or a GC.

Honest scope

Estimating and coordination support — never stamped engineering claims we can’t make.

FAQ

Frequently asked questions

Do you provide electrical estimating across Canada?
Yes. We provide electrical estimating and takeoff support remotely for contractors and general contractors across every Canadian province and territory, working from your PDF or DWG tender set.
Do you use the Canadian Electrical Code?
Our estimating and scope review are informed by CSA C22.1 / the Canadian Electrical Code, provincial amendments and practices, project specifications, local utility requirements, and the bid documents. Final compliance remains subject to the project engineer and the authority having jurisdiction.
What do I receive with the estimate?
A reviewable package: a quantity takeoff workbook, colour-coded marked-up drawings, a material list by system, a labour-hour summary with the labour-unit basis and assumptions, inclusions and exclusions, an RFI / scope-gap log, addenda review, and a bid summary.
Can you review addenda?
Yes. Addenda review is part of the scope. Send every addendum issued and we reconcile it against the base set so nothing is missed.
Do you provide stamped engineering?
No. MeTiger provides estimating, takeoff, documentation, and coordination support. We do not replace the engineer of record, the authority having jurisdiction, or stamped professional engineering requirements.
How fast can you deliver?
Delivery depends on sheet count, scope complexity, and the bid deadline. We confirm a specific delivery window with your quote, before work begins.
Do you sign NDAs?
Yes. An NDA is available on request before you share tender documents or plan links.

Send your bid set and get a fixed quote

Upload your drawings or share a plan link with the bid due date. MeTiger confirms scope, fee, and delivery window before any work begins.