Electrical Bid Review — A Second Set of Eyes
You have the drawings, the takeoff, and a deadline. What you don't always have is a fresh, independent set of eyes on the number before it goes out the door. MeTiger reviews your electrical estimate and quantities — catching scope gaps, missing systems, unbalanced quantities, missing addenda, and other-trade equipment power that never got counted — so you submit with confidence instead of crossed fingers.
Who an electrical bid review is for
A bid review is not a sign you got it wrong — it's how experienced teams protect margin on the bids that matter most.
Contractors racing a deadline
The tender closes in hours and the count was rushed. We catch what the pressure hid before you commit to a number you'll live with.
GCs levelling sub bids
Three quotes, three different scopes. We help you see which bid is actually missing scope rather than simply cheaper.
Estimators wanting a check
A clean estimate deserves a senior, independent second opinion on your quantities and assumptions before it reaches the client.
What we review in your estimate
We compare your takeoff and scope against the drawings, specifications, schedules, and addenda — line by line where it counts.
- Scope gaps between drawings, specifications, schedules, and addenda
- Missing systems — lighting controls, fire alarm, grounding, low-voltage rough-in
- Unbalanced or unreasonable quantities against the drawing count
- Other-trade equipment power (mechanical, kitchen, process) left uncounted
- Addenda that changed scope and never made it into the count
- Weak or missing exclusions that leave your bid exposed after award
- Labour-unit and crew productivity assumptions that look optimistic
What you get back
A marked-up review
Your drawings and takeoff annotated where we see risk — colour-coded so you can jump straight to what needs a decision.
A scope-gap & RFI log
Every gap, conflict, and open question in one list — ready to send to the design team or fold into your exclusions.
A written risk summary
A short, plain-language rundown of the risks we found and what we'd recommend — the whole picture on one page.
Why bids get missed
The most expensive misses are rarely a wrong price — they're scope that was never counted at all, hidden in the seams between documents.
- Equipment power buried in the mechanical, kitchen, and process drawings
- Late addenda that shifted scope after the takeoff was done
- A tight deadline that forced a fast count with no time to check it
CEC-aware, honest about scope
Our review is informed by CSA C22.1 / the Canadian Electrical Code, provincial practices, project specifications, and local utility requirements. We flag where the documents disagree — we don't rule on code.
How a bid review works
Send your estimate and drawings
Your takeoff or estimate workbook alongside the PDF or DWG set, specifications, and every addendum — or a plan link.
Confirm scope and deadline
We confirm project type, how deep you want the review to go, and your bid due date.
Receive a quote
A fee and delivery window, quoted after drawing review, before any work begins.
Independent review
We check your quantities and scope against the documents and log every gap, conflict, and assumption.
Return findings
You receive the marked-up review, the scope-gap / RFI log, and a short written summary of risks and recommendations.
What a review costs
Every bid review is quoted after drawing review, based on sheet count, scope complexity, and how deep you want us to go. Send the set and your deadline; we confirm the fee and delivery window before work begins.
Need more than a review?
Short on time to build the estimate in the first place? We can do the count for you.
Looking for USA estimating? Visit metiger.us.
Frequently asked questions
What is an electrical bid review?
Do you re-estimate the whole project?
Is the review informed by the Canadian Electrical Code?
What do you need from me to start?
How fast can you turn a review around?
Is my bid kept confidential?
What does a bid review cost?
Get a second set of eyes before you submit
Send your estimate, drawings, and bid deadline. MeTiger confirms scope, fee, and delivery window, then returns a marked-up review, a scope-gap log, and a written summary of the risks worth fixing before bid day.