Ontario Electrical Estimating

Ontario Electrical Estimating Services

MeTiger provides electrical estimating and takeoff support for contractors and general contractors working across Ontario — from the Greater Toronto Area to Ottawa, Hamilton, London, Kitchener-Waterloo, and Windsor. We turn your tender drawings, specifications, and addenda into clean quantities, labour summaries, marked-up plans, and documented scope, all delivered remotely so a job’s location in the province never slows the bid.

Ontario-focused estimatingOESC / CEC-aware scope reviewMarked-up plansLabour & material summariesRemote across the provinceNDA on request
Local context

Electrical estimating built for Ontario projects

Ontario electrical work is inspected by the Electrical Safety Authority (ESA), and installations follow the Ontario Electrical Safety Code (OESC) — the Canadian Electrical Code, CSA C22.1, adopted with Ontario amendments. We estimate to what the tender documents call for and keep that provincial context in view while we count.

Projects across the province also touch different local distribution utilities, and service, metering, and utility-coordination notes can differ between them. We account for the servicing details shown on your drawings whether the work sits in Hydro One, Toronto Hydro, Alectra Utilities, Hydro Ottawa, or Elexicon Energy territory, and we flag where the documents leave the utility interface unclear so it can be resolved before bid day.

Project types

Ontario project types we estimate

Commercial tenant improvements

Office fit-outs, retail build-outs, and commercial tenant improvements across the GTA and Ontario’s urban centres.

ICI construction

Industrial, commercial, and institutional projects with mixed power, lighting, and low-voltage scope.

Warehouses & distribution

Warehouses and distribution centres along Ontario’s logistics corridors — high-bay lighting, feeders, and equipment power.

Institutional

Schools, healthcare, and public facilities with life-safety, emergency lighting, and systems coordination.

Multi-family & high-rise

Multi-family developments and high-rise residential — suite power, common areas, and distribution risers.

Service & upgrades

Service upgrades, distribution changes, and retrofit work on existing Ontario buildings.

Deliverables

What your Ontario estimate includes

  • Quantity takeoff workbook
  • Colour-coded marked-up drawings
  • Material list by system
  • Labour-hour summary
  • Labour-unit basis and assumptions
  • Regional labour adjustment for the Ontario market
  • Inclusions and exclusions
  • Drawing and specification assumptions
  • RFI and scope-gap log
  • Addenda review
  • Utility-coordination notes where shown
  • Bid summary
Coverage

Electrical systems we quantify

Service & distribution

  • Service entrance and distribution
  • Switchgear, switchboards, panels
  • Transformers
  • Metering and utility interface

Power & feeders

  • Feeders and branch power
  • Raceways and conductors
  • Cable tray and supports
  • Mechanical equipment power

Motors & controls

  • Pumps, motors, VFDs
  • Starters and MCCs
  • Generators, ATS, UPS
  • Battery systems

Lighting

  • Interior lighting and controls
  • Emergency lighting and life safety
  • Site and parking lighting
  • Underground electrical

Grounding & safety

  • Grounding and bonding
  • Fire alarm coordination
  • Life-safety coordination

Low voltage & special systems

  • Low-voltage rough-in
  • Data / communications rough-in
  • Access control / security rough-in where included
  • EV charger rough-in where included
Code & compliance

Ontario code & compliance

Our estimating and scope review are informed by the Ontario Electrical Safety Code (OESC) — the Canadian Electrical Code, CSA C22.1, adopted with Ontario amendments — alongside the project specifications, drawings, addenda, and local utility requirements. We estimate what the documents describe and note where they conflict or leave a gap, so nothing is priced on a silent assumption.

Final compliance remains subject to the project engineer, the Ontario authority having jurisdiction — including the Electrical Safety Authority (ESA) — and applicable provincial requirements. MeTiger provides estimating and coordination support only. We do not produce stamped drawings, sealed or professional engineering, or code-compliance certification, and we work alongside the engineer of record where required.
Process

How it works

1

Upload drawings or send a plan link

Send your PDF or DWG set, specifications, and addenda — or a Dropbox, Drive, or Procore link.

2

Confirm scope and deadline

We confirm the Ontario location, project type, scope, and bid due date.

3

Receive a quote

A fee and delivery window, quoted after drawing review, before any work begins.

4

Takeoff and scope review

We perform the takeoff and organize the electrical scope by system.

5

Deliver the package

You receive the reviewable estimate package, with an optional walkthrough call before submission.

Looking for USA estimating? Visit metiger.us.

FAQ

Ontario estimating FAQ

Do you provide electrical estimating across Ontario?
Yes. We support electrical contractors and general contractors across Ontario remotely — the Greater Toronto Area, Ottawa, Mississauga, Brampton, Hamilton, London, Kitchener-Waterloo, Windsor, and smaller centres in between. Everything is delivered from your PDF or DWG tender set, so location on a job never limits who we can help.
Which electrical code do you estimate to in Ontario?
Our takeoffs and scope review are informed by the Ontario Electrical Safety Code (OESC) — the Canadian Electrical Code, CSA C22.1, with Ontario amendments — together with the project specifications, drawings, addenda, and local utility requirements. Final compliance remains subject to the project engineer, the Ontario authority having jurisdiction, and applicable provincial requirements.
Can you work from PDF or DWG drawings?
Both. Send a PDF tender set or DWG / CAD files, the specifications, and any addenda — or share a Dropbox, Drive, or Procore link. We work from whatever the design team issued.
How does remote delivery work for an Ontario contractor?
You upload the bid set and confirm the due date; we confirm scope, fee, and a delivery window before starting, then return a reviewable estimate package on the agreed date. No site visit is required for a takeoff, so distance across the province is not a factor.
Do you sign an NDA before we share drawings?
Yes. A non-disclosure agreement is available on request before you share any tender documents or plan links.

Explore our full Canadian electrical estimating services, or see sibling coverage for Alberta and British Columbia.

Estimating support for your next Ontario project

Upload your drawings or share a plan link with the bid due date. MeTiger confirms scope, fee, and delivery window before any work begins.