Retail Electrical Estimating

Retail Electrical Estimating in Canada

MeTiger turns retail tender drawings, tenant criteria, and landlord requirements into clean electrical takeoffs, material lists, labour summaries, and marked-up drawings. Whether it is a single storefront fit-out, a store remodel, or a multi-site rollout, we build a package your team can bid with confidence — clear quantities, clear assumptions, and clear exclusions before the deadline.

Fit-outs & remodelsMulti-site rolloutsLED retrofit takeoffsLive-store phasing notesCEC-aware scope review
Project types

Retail projects we estimate

Retail electrical scope changes a lot between a new store, a refresh, and a national program. We estimate all of it, and price each job for what its drawings and site conditions actually demand.

Store fit-outs

New tenant fit-outs in malls, plazas, and mixed-use developments — branch power, lighting, signage, and life-safety rough-in from base building to turnover.

Store remodels

Remodels and refreshes where demolition, existing conditions, and reused infrastructure all affect the count and the labour.

Multi-site rollouts

Chain and franchise rollout programs that need a consistent, repeatable takeoff basis across many locations.

Big-box & grocery

Big-box and grocery projects with refrigeration power, heavy lighting counts, and coordination with mechanical and other trades.

Deliverables

What your retail estimate includes

Every retail package is built to be reviewed line by line, not taken on trust.

  • Quantity takeoff workbook
  • Colour-coded marked-up drawings
  • Material list by system
  • Labour-hour summary
  • Labour-unit basis and project-specific assumptions
  • Inclusions and exclusions
  • Landlord and tenant-criteria assumptions
  • RFI and scope-gap log
  • Addenda review
  • Phasing and temporary-power notes where applicable
  • Multi-site consistency notes for rollout programs
  • Bid summary
Coverage

Retail electrical scope we quantify

Lighting & controls

  • Sales-floor and back-of-house lighting
  • LED retrofit and re-lamp scope
  • Feature, display, and accent lighting
  • Track and case lighting
  • Lighting controls and occupancy sensors
  • Emergency and exit lighting

Signage & exterior

  • Interior and exterior signage power
  • Storefront and canopy lighting
  • Pylon and monument sign feeds
  • Site and parking-area lighting
  • Exterior receptacles and connections

Branch power & devices

  • Receptacles and dedicated circuits
  • Point-of-sale and checkout power
  • Millwork and display-fixture power
  • Data and communications rough-in
  • Panels, feeders, and distribution

Refrigeration & equipment power

  • Refrigeration rack and case power
  • Walk-in cooler and freezer connections
  • Grocery equipment disconnects
  • Mechanical and other-trade equipment power

Life safety & low voltage

  • Fire alarm rough-in and coordination
  • Emergency lighting and egress
  • Security and access-control rough-in where included
  • EV charger rough-in where included

Service & infrastructure

  • Service and metering coordination
  • Distribution and subpanels
  • Grounding and bonding
  • Utility and landlord coordination notes
Phasing & programs

Live-store phasing and multi-site consistency

Retail rarely happens on an empty site. Remodels and refreshes often run around live store operations, and program work has to stay consistent across dozens of locations. We build both realities into the estimate so the labour impact is visible before award, not discovered on site.

  • Night, after-hours, and off-hours work reflected where the documents require it
  • Temporary power and phased-cutover assumptions logged clearly
  • Demolition and existing-condition allowances called out for remodels
  • A repeatable takeoff basis so rollout pricing stays comparable location to location
  • Per-site adjustments for base-building conditions, regional labour, and local requirements
Working around a live store changes labour productivity and sequencing. We document our phasing and temporary-power assumptions so your team can price the impact rather than absorb it after the fact.
Approach

CEC-aware retail estimating

Our retail estimating support is informed by CSA C22.1 / the Canadian Electrical Code, provincial amendments and practices, tenant design criteria, landlord standards, project specifications, and local utility requirements. We quantify what the documents call for and flag where they do not agree.

Final compliance remains subject to the project engineer, the local authority having jurisdiction (AHJ), and applicable provincial or territorial requirements. MeTiger provides estimating and coordination support — not stamped drawings, sealed engineering, or code-compliance certification — and works alongside the engineer of record where required.
Process

How it works

1

Send drawings or a plan link

Share your PDF or DWG set, tenant criteria, landlord standards, and any addenda — or a Dropbox / Drive / Procore link.

2

Confirm scope and deadline

We confirm store type, location, phasing needs, rollout count if any, and the bid due date.

3

Receive a quote

A fee and delivery window, quoted after drawing review, before work begins.

4

Takeoff and scope review

We perform the retail takeoff and organize the electrical scope by system.

5

Document assumptions and gaps

Phasing, exclusions, and scope gaps are logged clearly in an RFI-ready format.

6

Deliver the package

You receive the reviewable estimate package on the agreed window, with an optional walkthrough call.

Pricing

Pricing and quote process

Every retail project is quoted after drawing review, based on store size, scope complexity, phasing, rollout count, deadline, and requested deliverables. Send the bid set and due date; MeTiger confirms scope, fee, and delivery window before any work begins — a clear fee for a package you can actually bid with, quoted after drawing review rather than guessed up front.

Related: Restaurant electrical estimating · Commercial electrical estimating · Electrical takeoff services. Looking for USA estimating? Visit metiger.us.

FAQ

Retail estimating FAQ

Do you estimate retail fit-outs and store remodels across Canada?
Yes. We prepare retail electrical takeoffs and estimates remotely for contractors and general contractors across every Canadian province and territory, working from your PDF or DWG tender set, tenant criteria, and landlord requirements.
Can you handle multi-site retail rollout programs?
Yes. For multi-store programs we build a consistent takeoff basis so pricing stays comparable from location to location, then adjust each site for its base-building conditions, regional labour, and local landlord and utility requirements.
Do you quantify grocery refrigeration power?
Yes. We quantify branch power, feeders, disconnects, and rough-in for refrigeration racks, cases, and walk-ins based on the equipment schedules and other-trade documents, and we flag connections that are unclear so nothing is priced blind.
Does the estimate account for working in a live store?
We can reflect night phasing, after-hours work, and temporary power assumptions where the tender documents call for them, and we log those assumptions clearly so your team can price the labour impact rather than absorb it.
Is your work informed by the Canadian Electrical Code?
Our estimating and scope review are informed by CSA C22.1 / the Canadian Electrical Code, provincial amendments, project specifications, landlord criteria, and local utility requirements. Final compliance remains subject to the project engineer, the local authority having jurisdiction (AHJ), and applicable provincial or territorial requirements.
Do you provide stamped drawings or engineering?
No. MeTiger provides estimating, takeoff, and coordination support and works alongside the engineer of record where required. We do not provide stamped drawings, sealed engineering, or code-compliance certification.

Get a retail electrical estimate

Upload your fit-out, remodel, or rollout drawings and share the bid due date. MeTiger confirms scope, fee, and delivery window before any work begins.